An open room with the old floor removed and the concrete slab scraped.
Removal & prepRemoval & prepWimauma, FL

Old Floor Removal and Subfloor Prep in Wimauma, FL

On a newer slab or an older wood subfloor, the new floor depends on what is under it. We take out the old carpet, tile or plank, clean and flatten the slab, replace subfloor sheets past saving and write each step down.

  • Old tile, plank or carpet taken out
  • Old mortar and adhesive scraped off
  • Low spots filled before the new floor
  • What comes out, written room by room
Free estimateValin Remodeling

Get your free estimate

Fields marked * are required.

Step 1 of 3 Your contact details

Step 2 of 3 About the work

Step 3 of 3 Confirm and send

  • Free in-home walkthrough
  • Old floor out, room by room
  • Low spots filled
  • Price, spec & scope in writing

Old floor removal & prep in Wimauma

Two Kinds of Prep in Wimauma

Most new homes in Wimauma's communities sit on a concrete slab. When the builder carpet and tile come out, the job is scraping off the mortar, the adhesive and the tack strips, then filling any low spots so the new floor lies flat. A newer slab is usually in good shape, but builder floors can hide dips and ridges that only show once the old floor is gone.

Manufactured homes and some older homes on rural land sit on a wood subfloor instead. There, removal means pulling up old carpet, vinyl or plank without tearing the sheets underneath, then walking the floor for soft spots, often near a bathroom, the laundry or an outside entry where water has gotten in over the years. Weak sheets get replaced before the new floor goes down, and any change is handled the way your written estimate and contract describe.

What goes into it

Everything That Happens Before the New Floor

The part of the job nobody sees decides how the new floor looks in a year. It goes on your estimate like everything else.

  1. Out

    The old floor

    Old tile, old plank or carpet comes out of each room on the scope.

    TileTaken up
    Plank & carpetTaken out
    Old baseboardsOff if replaced
  2. Clean

    The slab

    What's left of the old floor and its adhesive gets scraped off.

    MortarScraped
    AdhesiveScraped
    Pad & tack stripsOff
  3. Flat

    Ready for the floor

    Low spots get filled; subfloor sheets past saving get replaced.

    Low spotsFilled
    SubfloorReady
    New floorNext

On your written estimate

  • What comes out, room by room
  • What gets prepped
  • The new floor that goes in
  • The full price, upfront

Planned with you at the walkthrough

  • Which rooms are on the scope
  • What stays and what goes
  • The new floor you pick

If the old floor hides damage, like a soft subfloor, your written estimate and contract say how any change is handled.

Scope sheet · Example · Not a quoteExampleValin Remodeling
Example scope sheet
#ItemSpecYour price
01Take out the old floorRoom by roomWritten on your estimate
02Scrape the slabMortar and adhesiveWritten on your estimate
03Fill low spotsLeveling compoundWritten on your estimate
04Subfloor sheetsWhere neededWritten on your estimate
05Install the new floorThe floor you pickWritten on your estimate
TotalIn writing, before we start

This is an example. Your sheet is written for your home at the walkthrough.

Know what you're paying for

The Prep, Line by Line, Before We Start

Removal and prep are lines on your estimate, next to the new floor, so nothing about them is a surprise.

  • Looked at in person

    We see the old floor and what's under it at the walkthrough.

  • Written down

    What comes out and what gets prepped is on your estimate.

  • Priced before we start

    You get the price and the scope in writing first.

A real job

Old Tile Out, Slab Ready

A single-story home, photographed by our own crew from the old tile coming up to the new floor going down.

Day oneA bedroom with dark paneled walls on day one: a bare, marked concrete slab.
Day one · bare concrete slab
DoneThe same bedroom when done, with a gray herringbone floor.
Done · herringbone floor

Herringbone home · same bedroom, bare slab to finished floor

The same house, step by step

  1. Old ceramic tile pried up and stacked on the floor of a dining area.

    Out

    The old tile comes up

    The old ceramic tile came up, and the old baseboards came off.

  2. A concrete slab scraped clean after the old tile came out.

    Clean

    Scraped down to the slab

    What was left of the mortar was scraped off the slab.

  3. A concrete slab with strips of leveling compound filling the low spots.

    Flat

    Low spots filled

    Leveling compound filled the low spots.

  4. New wood-look planks going down over a thin underlayment sheet.

    Next

    The new floor goes down

    Then the underlayment and the new planks went down.

Get my free estimate

Room by room in Wimauma

What Lies Under Wimauma Floors

Here is what we expect to take up in a Wimauma home, new or old, before the new floor goes in.

  • Entry hallAn entry hall with a gray herringbone floor.
    Entry hall
  • Living roomA stone fireplace wall with wood shelves over a gray herringbone floor.
    Living room
  • Builder carpet and pad

    Carpet, pad and tack strips out of the bedrooms, with the staples and glue spots scraped off the slab.

  • Builder tile on a newer slab

    Tile and its mortar taken up, then the slab checked for dips that the old tile was hiding.

  • Sheet vinyl over wood

    Older vinyl in a manufactured home pulled up with care, so the subfloor sheets underneath stay intact.

  • Soft spots in the subfloor

    Sheets that flex or feel spongy, often by a bathroom or an entry, replaced before the new floor.

On the jobAn installer kneeling to fit new wood-look plank flooring in a large open room.
A new plank floor going in on one of our recent jobs.

Who comes to your home

A Family-Owned Company Based in Bradenton

Valin Remodeling is a family-owned company based in Bradenton, Florida, owned and run by Rafael Valintim. Every project gets personal attention, clear communication and a clean process, from the first visit to the final detail.

  • Free in-home walkthrough
  • Every room measured with you
  • We help you choose every material
  • You get the price, the material spec and the scope in writing, before we start.

Call (941) 241-2071

Questions

Old floor removal & prep questions we hear in Wimauma

What does floor removal cost in Wimauma?

Slab or wood subfloor makes the biggest difference. On a slab, it comes down to how much tile and mortar come up and how much filling follows. On a wood subfloor, it depends on how many sheets need replacing, which is only an estimate until the old floor is up. Removal and prep are written as their own lines after a free walkthrough.

How do you find soft spots in a manufactured home floor?

We walk every room at the walkthrough, feeling for spots that flex or sound hollow, and pay extra attention near the bathroom, the kitchen sink and the outside entries. Some problems only show once the old floor is up. Your estimate and contract say how a change like that is handled.

Do I really need to take out my builder tile?

In most cases, yes. Laying a new floor over builder tile raises the height at every doorway and cabinet, and grout lines can show through some floors over time. Taking it up gives the new floor a clean, flat slab. We look at your rooms and tell you what we would do.

Can the old floor come out before we move in?

Yes, and an empty home is the easiest place to do it. With no furniture to work around, the old floor comes up and the slab gets prepped in one pass, room after room. Tell us your closing and move-in dates, and we plan the walkthrough and the work around them.

Free estimate

Not Sure What's Under Your Floor?

Tell us about your rooms. We come out, look at the old floor with you and write down what comes out and what goes in.

What you get

  1. No charge for the walkthrough
  2. Removal and prep written down
  3. The full price, upfront

Prefer to call?

(941) 241-2071
Free estimateValin Remodeling

Fields marked * are required.

Step 1 of 3 Your contact details

Step 2 of 3 About the work

Step 3 of 3 Confirm and send