An open room with the old floor removed and the concrete slab scraped.
Removal & prepRemoval & prepNokomis, FL

Old Floor Removal and Subfloor Prep in Nokomis, FL

Under a Nokomis floor you may find a ranch slab with old tile, a beach home with sand worked into everything, or the wood subfloor of a manufactured home. We take out the old floor, prep what's under it and write each step down.

  • Old tile, plank or carpet taken out
  • Old mortar and adhesive scraped off
  • Low spots filled before the new floor
  • What comes out, written room by room
Free estimateValin Remodeling

Get your free estimate

Fields marked * are required.

Step 1 of 3 Your contact details

Step 2 of 3 About the work

Step 3 of 3 Confirm and send

  • Free in-home walkthrough
  • Old floor out, room by room
  • Low spots filled
  • Price, spec & scope in writing

Old floor removal & prep in Nokomis

Tile on Slabs, Sand and Raised Floors

In the ranch homes east of US 41, the usual find is ceramic tile set right on the slab, or carpet with pad and tack strips in the bedrooms. The tile comes up, the old mortar is scraped off the concrete and the low spots get filled with leveling compound, so the new floor has a flat base. Tile on a slab is heavy, loud work, so we plan the dust and the hauling before the first day.

Manufactured homes are a different job. The old floor, often carpet or old plank, comes off a wood subfloor on a raised frame, and that subfloor gets a close look for soft or damaged sheets, which are replaced where needed. On Casey Key, sand gets under and around old floors and has to be cleaned out completely, and hauling debris off the key takes planning around the bridges and the narrow road. If damage turns up, the change follows your written estimate and contract.

What goes into it

Everything That Happens Before the New Floor

The part of the job nobody sees decides how the new floor looks in a year. It goes on your estimate like everything else.

  1. Out

    The old floor

    Old tile, old plank or carpet comes out of each room on the scope.

    TileTaken up
    Plank & carpetTaken out
    Old baseboardsOff if replaced
  2. Clean

    The slab

    What's left of the old floor and its adhesive gets scraped off.

    MortarScraped
    AdhesiveScraped
    Pad & tack stripsOff
  3. Flat

    Ready for the floor

    Low spots get filled; subfloor sheets past saving get replaced.

    Low spotsFilled
    SubfloorReady
    New floorNext

On your written estimate

  • What comes out, room by room
  • What gets prepped
  • The new floor that goes in
  • The full price, upfront

Planned with you at the walkthrough

  • Which rooms are on the scope
  • What stays and what goes
  • The new floor you pick

If the old floor hides damage, like a soft subfloor, your written estimate and contract say how any change is handled.

Scope sheet · Example · Not a quoteExampleValin Remodeling
Example scope sheet
#ItemSpecYour price
01Take out the old floorRoom by roomWritten on your estimate
02Scrape the slabMortar and adhesiveWritten on your estimate
03Fill low spotsLeveling compoundWritten on your estimate
04Subfloor sheetsWhere neededWritten on your estimate
05Install the new floorThe floor you pickWritten on your estimate
TotalIn writing, before we start

This is an example. Your sheet is written for your home at the walkthrough.

Know what you're paying for

The Prep, Line by Line, Before We Start

Removal and prep are lines on your estimate, next to the new floor, so nothing about them is a surprise.

  • Looked at in person

    We see the old floor and what's under it at the walkthrough.

  • Written down

    What comes out and what gets prepped is on your estimate.

  • Priced before we start

    You get the price and the scope in writing first.

A real job

Old Tile Out, Slab Ready

A single-story home, photographed by our own crew from the old tile coming up to the new floor going down.

Day oneA bedroom with dark paneled walls on day one: a bare, marked concrete slab.
Day one · bare concrete slab
DoneThe same bedroom when done, with a gray herringbone floor.
Done · herringbone floor

Herringbone home · same bedroom, bare slab to finished floor

The same house, step by step

  1. Old ceramic tile pried up and stacked on the floor of a dining area.

    Out

    The old tile comes up

    The old ceramic tile came up, and the old baseboards came off.

  2. A concrete slab scraped clean after the old tile came out.

    Clean

    Scraped down to the slab

    What was left of the mortar was scraped off the slab.

  3. A concrete slab with strips of leveling compound filling the low spots.

    Flat

    Low spots filled

    Leveling compound filled the low spots.

  4. New wood-look planks going down over a thin underlayment sheet.

    Next

    The new floor goes down

    Then the underlayment and the new planks went down.

Get my free estimate

Room by room in Nokomis

Old Floors We Expect in Nokomis

These are the layers that most often come up in a Nokomis home before the new floor goes down.

  • Entry hallAn entry hall with a gray herringbone floor.
    Entry hall
  • Living roomA stone fireplace wall with wood shelves over a gray herringbone floor.
    Living room
  • Ceramic tile on ranch slabs

    Set straight onto the concrete decades ago. It comes up in pieces and the old mortar gets scraped off.

  • Carpet in mainland bedrooms

    Carpet, pad and tack strips pulled from the slab, then the glue spots and low areas taken care of.

  • Floors on a raised frame

    In manufactured homes, the old floor comes off a wood subfloor that is checked sheet by sheet before anything new goes on.

  • Sand under beach-home floors

    On Casey Key, grit works its way under old floors. It gets cleaned out so the new floor sits on a clean base.

On the jobAn installer kneeling to fit new wood-look plank flooring in a large open room.
A new plank floor going in on one of our recent jobs.

Who comes to your home

A Family-Owned Company Based in Bradenton

Valin Remodeling is a family-owned company based in Bradenton, Florida, owned and run by Rafael Valintim. Every project gets personal attention, clear communication and a clean process, from the first visit to the final detail.

  • Free in-home walkthrough
  • Every room measured with you
  • We help you choose every material
  • You get the price, the material spec and the scope in writing, before we start.

Call (941) 241-2071

Questions

Old floor removal & prep questions we hear in Nokomis

How do you price floor removal in Nokomis?

Room by room, by what comes up and what the base needs after. Old tile on a ranch slab takes more labor than carpet, a manufactured home may need subfloor sheets replaced, and Casey Key adds hauling across a bridge. You see each of those as its own line on the estimate, written after a free walkthrough.

What do you do with the subfloor in a manufactured home?

We walk it once the old floor is up. Soft or damaged sheets get replaced, low spots get filled and the surface is cleaned, so the new floor has a solid, flat base. Anything we can't see until the floor is off gets talked through with you before the work goes further.

How do you haul old flooring off Casey Key?

With a plan agreed ahead of time. We decide which bridge the truck uses, where it can park on the narrow road and how often it runs, then schedule the loud part of the tear-out for reasonable hours. Tell us if your street has its own parking rules.

Can you take out old plank that swelled near the water?

Yes. Planks that swelled or lifted come out like any old floor, and whatever glue or pad is under them gets scraped off. Then we look closely at the slab or subfloor underneath. If something soft or damaged shows up, the change is handled the way your written estimate and contract say.

Free estimate

Not Sure What's Under Your Floor?

Tell us about your rooms. We come out, look at the old floor with you and write down what comes out and what goes in.

What you get

  1. No charge for the walkthrough
  2. Removal and prep written down
  3. The full price, upfront

Prefer to call?

(941) 241-2071
Free estimateValin Remodeling

Fields marked * are required.

Step 1 of 3 Your contact details

Step 2 of 3 About the work

Step 3 of 3 Confirm and send