An open room with the old floor removed and the concrete slab scraped.
Removal & prepRemoval & prepLakewood Ranch, FL

Old Floor Removal and Slab Prep in Lakewood Ranch, FL

Under the builder carpet and tile in a Lakewood Ranch home is a concrete slab, and upstairs a wood subfloor. We take the old floor out, get both clean and flat, and write each step on your estimate.

  • Old tile, plank or carpet taken out
  • Old mortar and adhesive scraped off
  • Low spots filled before the new floor
  • What comes out, written room by room
Free estimateValin Remodeling

Get your free estimate

Fields marked * are required.

Step 1 of 3 Your contact details

Step 2 of 3 About the work

Step 3 of 3 Confirm and send

  • Free in-home walkthrough
  • Old floor out, room by room
  • Low spots filled
  • Price, spec & scope in writing

Old floor removal & prep in Lakewood Ranch

What Comes Out Before Your New Floor

In a newer Lakewood Ranch home, removal is mostly builder carpet, its pad and the tack strips along the walls, plus the tile in the kitchen, the entry and the bathrooms. The carpet and pad roll up and the strips come off. Tile is the heavier part: it gets broken up, and the mortar left behind is scraped off the slab so the new floor isn't sitting on ridges. Then low spots get filled with leveling compound.

In the first villages, there may be more than one layer to deal with, like old plank or glue left from an earlier floor change. Upstairs in a two-story home, the subfloor is wood, and sheets that are soft or damaged get replaced before anything new goes down. If the removal turns up something nobody could see beforehand, your estimate and contract already set out how a change is handled.

What goes into it

Everything That Happens Before the New Floor

The part of the job nobody sees decides how the new floor looks in a year. It goes on your estimate like everything else.

  1. Out

    The old floor

    Old tile, old plank or carpet comes out of each room on the scope.

    TileTaken up
    Plank & carpetTaken out
    Old baseboardsOff if replaced
  2. Clean

    The slab

    What's left of the old floor and its adhesive gets scraped off.

    MortarScraped
    AdhesiveScraped
    Pad & tack stripsOff
  3. Flat

    Ready for the floor

    Low spots get filled; subfloor sheets past saving get replaced.

    Low spotsFilled
    SubfloorReady
    New floorNext

On your written estimate

  • What comes out, room by room
  • What gets prepped
  • The new floor that goes in
  • The full price, upfront

Planned with you at the walkthrough

  • Which rooms are on the scope
  • What stays and what goes
  • The new floor you pick

If the old floor hides damage, like a soft subfloor, your written estimate and contract say how any change is handled.

Scope sheet · Example · Not a quoteExampleValin Remodeling
Example scope sheet
#ItemSpecYour price
01Take out the old floorRoom by roomWritten on your estimate
02Scrape the slabMortar and adhesiveWritten on your estimate
03Fill low spotsLeveling compoundWritten on your estimate
04Subfloor sheetsWhere neededWritten on your estimate
05Install the new floorThe floor you pickWritten on your estimate
TotalIn writing, before we start

This is an example. Your sheet is written for your home at the walkthrough.

Know what you're paying for

The Prep, Line by Line, Before We Start

Removal and prep are lines on your estimate, next to the new floor, so nothing about them is a surprise.

  • Looked at in person

    We see the old floor and what's under it at the walkthrough.

  • Written down

    What comes out and what gets prepped is on your estimate.

  • Priced before we start

    You get the price and the scope in writing first.

A real job

Old Tile Out, Slab Ready

A single-story home, photographed by our own crew from the old tile coming up to the new floor going down.

Day oneA bedroom with dark paneled walls on day one: a bare, marked concrete slab.
Day one · bare concrete slab
DoneThe same bedroom when done, with a gray herringbone floor.
Done · herringbone floor

Herringbone home · same bedroom, bare slab to finished floor

The same house, step by step

  1. Old ceramic tile pried up and stacked on the floor of a dining area.

    Out

    The old tile comes up

    The old ceramic tile came up, and the old baseboards came off.

  2. A concrete slab scraped clean after the old tile came out.

    Clean

    Scraped down to the slab

    What was left of the mortar was scraped off the slab.

  3. A concrete slab with strips of leveling compound filling the low spots.

    Flat

    Low spots filled

    Leveling compound filled the low spots.

  4. New wood-look planks going down over a thin underlayment sheet.

    Next

    The new floor goes down

    Then the underlayment and the new planks went down.

Get my free estimate

Room by room in Lakewood Ranch

What Turns Up Under Lakewood Ranch Floors

Every home is a little different, but these are the layers we usually expect when the old floor comes up here.

  • Entry hallAn entry hall with a gray herringbone floor.
    Entry hall
  • Living roomA stone fireplace wall with wood shelves over a gray herringbone floor.
    Living room
  • Builder carpet, pad and tack strips

    In many bedrooms here, this is what comes out first. All of it goes, and the staple and glue spots get cleaned off.

  • Builder tile on the slab

    Tile in the main rooms is broken out and the mortar scraped down to a clean slab.

  • Upstairs subfloors

    Wood sheets under the carpet, checked for soft spots and replaced where needed before the new floor.

  • Low spots in the slab

    Filled with leveling compound so the new planks lie flat and the tile sits on an even bed.

On the jobAn installer kneeling to fit new wood-look plank flooring in a large open room.
A new plank floor going in on one of our recent jobs.

Who comes to your home

A Family-Owned Company Based in Bradenton

Valin Remodeling is a family-owned company based in Bradenton, Florida, owned and run by Rafael Valintim. Every project gets personal attention, clear communication and a clean process, from the first visit to the final detail.

  • Free in-home walkthrough
  • Every room measured with you
  • We help you choose every material
  • You get the price, the material spec and the scope in writing, before we start.

Call (941) 241-2071

Questions

Old floor removal & prep questions we hear in Lakewood Ranch

How is floor removal priced in a Lakewood Ranch home?

By what comes up and where. Carpet in the bedrooms is a lighter line than tile across the main floor, and stairs or a second story add their own. Leveling the slab and any subfloor sheets that need replacing are listed too. We look at your floors at the free walkthrough and write each line down before work starts.

Can you take out the carpet upstairs without marking the stairs and walls?

Yes, that's part of the plan. Old carpet and pad come down the stairs rolled up, and we protect the walls and the railing on the way. If the stairs are getting a new floor too, their old carpet comes off with the rest.

What if the slab under my builder floor is uneven?

Slabs are rarely perfectly flat, new or old. Once the old floor is out, we check the slab with a long level and fill the low spots with leveling compound. A flat slab matters most for large tile and long planks, which show every dip. The leveling is its own line on your estimate.

Can you remove floors while we're still living in the home?

Yes. We set the order of the rooms so you keep a kitchen and a bedroom to use, and keep the work area closed off as much as the home allows. If you'd rather the work happen while you're away, we can plan around that too.

Free estimate

Not Sure What's Under Your Floor?

Tell us about your rooms. We come out, look at the old floor with you and write down what comes out and what goes in.

What you get

  1. No charge for the walkthrough
  2. Removal and prep written down
  3. The full price, upfront

Prefer to call?

(941) 241-2071
Free estimateValin Remodeling

Fields marked * are required.

Step 1 of 3 Your contact details

Step 2 of 3 About the work

Step 3 of 3 Confirm and send